| CHeSS HC1 - Recommended
good practice (2000) |
CHeSS HC2 - Recommended best practice
(2000) |
| |
| Description HC1
Domestic Wet Central
Heating System with combination or Combined Primary Storage Unit CPSU
boiler (see note 3) |
Description HC2
Domestic Wet Central Heating System with combination or Combined Primary Storage
Unit CPSU boiler (see note 3) |
| |
Boiler
A combi or CPSU boiler which has a SEDBUK efficiency of at least :
- 78% if fuelled by natural gas (bands A to D)
- 80% if fuelled by LPG (bands A to C, and some from band D)
- 80% if fuelled by oil (bands A to C, and some from band D)
Boiler (see Notes 3 and 4) |
Boiler
A combi or CPSU boiler which has a SEDBUK efficiency of at least :
- 82% if fuelled by natural gas (bands A to C)
- 84% if fuelled by LPG (bands A and B, and some from band C)
- 82% if fuelled by oil (bands A to C)
Boiler (see Notes 3 and 4) |
| |
Hot water store
None, unless included within boiler |
Hot water store
None, unless included within boiler |
| |
Controls: (see
Notes 8, 9 and 10)
- Time switch
- Room thermostat
- Boiler interlock (see Note 11)
- TRVs on all radiators, except in rooms with a room thermostat
- Automatic bypass valve (see Note 12)
|
Control: (see
Notes 8, 9 and 10)
- Programmable room thermostat
- Boiler interlock (see Note 11)
- TRVs on all radiators, except in rooms with a room thermostat
- Automatic bypass valve (see Note 12)
|