Loading...

Recommended by The Advisory

Plumbers Business Insurance
plumbingpages.com
features news forums
e-mail   search site:  
 
 
 
 
Amazon mk2 unvented hot water cylinders
 
The best of both worlds..
 
Up until now, installers and specifiers have had two choices when it came to unvented hot water cylinders. The first is the 'standard' system, where an external expansion vessel needs to be connected by the installer. The second uses an internal air bubble, which removes the need for the vessel, but introduces the disadvantage of regular servicing to maintain the air bubble.

Now there is a third choice... the DPS Amazon unvented hot water cylinder is supplied with an external expansion vessel fitted inside the unit casing, removing the need for installers having to connect the vessel, while at the same time overcoming the disadvantage of having to service a bubble. In other words, the best of both worlds.

But there is more... hidden inside the casing you will also find the pressure reducing valve, strainer, expansion relief valve, non-return valve, and temperature and pressure relief valve, all factory fitted. The only items to be installed separately are the twin probe cylinder thermostat and energy cutout valve, on indirect units.

 

The advantages to the Amazon are numerous... quicker and easier installation, a much tidier cupboard space, both safety reliefs combined into a single 15mm relief, protection against transit damage to safety controls, protection against installer error, and reduced overall costs.

We can also offer customers their choice of pre-fabricated primary system controls, including Y-plan, S-plan, various pump sizes and types, and various programmer room stat combinations. On electric units we can pre-fit the units with suitable immersion heater controllers.

To top it off, the units come with 10 year guarantee against manufacturing defect, and all components are guaranteed for 2 years

Nominal capacity (litres) Nominal outer case dimensions (mm) Indirect re-heat times (minutes) Direct re-heat times (minutes) Immersion Heaters  - direct models Primary connection (mm) - indirect models
    STD HP   STD HP STD HP
125 h=1310
d=520
27 21 94 2x3kW 2x3kW 22 22
145 h=1475
d=520
29 19 110 2x3kW 2x3kW 22 22
185 h=1750
d=520
29 20 143 2x3kW 2x3kW 22 22
210 h=1550
d=570
29 21 168 2x3kW 3x3kW 22 28*
250 h=1900
d=570
27 20 200 2x3kW 3x3kW 22 28*
300 h=2060
d=570
32 20 225 2x3kW 3x3kW 22 28*

 

www.heatweb.com
Telephone: 01372 803 675/643

 
Dedicated Pressure Systems Limited
9-19 Manor Green Road, Epsom, Surrey KT19 8RA
Tel 01372 803675, Fax 01372 803678 Email dps@heatweb.com